805 Cherry Hills Drive UNIT 1
Failed City - Tubs leaking - Owner approved- Balance
Photos
Completed
Days open: 31
Warranty / owner-preferred contractor
Additional details
Remove all 6 Cartridges, remove 6 Handles, Replace with new cartridges and new handles. Repair spout to
hall bathroom to be flush with the wall
Assignment
Jorge ortiz
Scheduled: -
Unit Maintenance Profile
View full unit profile
BA unit id: 351
•
PM unit id: 890071
Unit maintenance sections are not available.
Completion
Completion date
20-Feb, 2:20 am
Completion notes
Remove all 6 cartridges, remove 6 handles, replace with new cartridges and new handles. Repair spout to hallbathroom to be flush with the wall. As we were attempting to remove the diverter cartridge from socket the cartridge because of being very worn broken inside of manifold. We sent in additional repair estimate to management for approval and approval was given we proceeded to do additional replacement of shower faucet to hall bathroom.
Remove filter where return is located behind hallway shower faucet wall, remove damaged faucet manifold, remove handles, remove trim. Install new 3 handle faucet, install new handles and trim kit, install plywood behind shower faucet manifold, install filter back, install filter grate.
Messages
No messages found for this meld yet (or sync hasn’t pulled them in).
Send a message
Choose recipients, then send.
Recipients
Contacts
Assignment
Jorge ortiz
This updates our dispatch assignment (and can differ from Property Meld until scheduled).
Tenant
-
Phone not available via API
Technician / Vendor Assigned
Jorge ortiz
Scheduled: -
AI Coordinator Assistant Click to expand
Suggestion
—