Meld 11828252
Brief description: Make Ready
In progress
Days open: 5
Tags
Make-Ready
Additional details
Gather and bag all tenant loose items throughout the interior and exterior of property, Such as clothing,furniture, bed frame and other misc items, Place in neat pile in backyard for haul away.
Deep clean, Remove foreign objects, Prep, seal holes, Fill cracks, Re-tape, mud, texture as needed, Paint entire units walls entirely 1 coat color match.
Repair multiple cracks throughout unit ceiling, Re-texture, and paint entire ceiling throughout unit. 1 coat color match.
Install new door and hardware for laundry room 32" x 80", Missing at time of inspection.
Deep clean and paint all interior doors and casings throughout unit including trim. 1 coat color match
Re-paint front door exterior with closest possible color match. including casings and trim. Contractor will match visually.
Re-paint rear door exterior with same color as front door.
Re-install panel back in screen door for side door, Left uninstalled by door.
Remove worn weather striping from side door and install fresh weather striping to provide a proper seal.
Deep clean and paint all shelving throughout
Deep clean, Caulk and paint Baseboards throughout unit.
Deep clean and paint all window sills throughout
Deep clean, Sand, Prep,prime, and paint kitchen cabinets and drawers, Interior and exterior, Ultra pure white.
Deep clean countertop,Prep, and refinish kitchen countertop and backsplash. https://www.homedepot.com/p/Rust-Oleum-Specialty-29-oz-Countertop-Coating-Tint-Base-246068/202820906 (Cobblestone)
Deep clean and resurface tub (Tub only)
Replace plywood for bottom of bathroom vanity damaged and warped, 21" x 40"
Deep clean, Sand, Prep,prime, and paint vanity interior and exterior, Ultra pure white.
Replace toilet paper roller due to age and calcium build up.
Bathroom showerhead leaking, Remove shower head add teflon tape to threads and reinstall, Alert Blue Atlas if leaking continues.
Inspect shower handle cartridge, Shower handle spins in a 360 not depicting a clear shut off, Attempt to repair and Alert Blue Atlas if further action is needed.
Replace bathroom switch cover due to age and rust.
Install 2 outlet covers 1 in rear bedroom and 1 in center bedroom, Missing at time of inspection.
Investigate wiring in dining room outlet box and Alert coordinator of findings for further instruction.
Replace 4 burnt out/missing light bulbs throughout home as needed.
Remove shoe string from bedroom ceiling fan and install proper ceiling fan pull strings.
Replace existing Dishwasher with new black hotpoint dishwasher, Existing dishwasher seems to be prior 2010 and was unable to locate exact age. Dishwasher was not functioning at time of inspection.
Replace 2 damaged vinyl blinds throughout unit. (1) 24" x 72", (1) 35" x 72" side door and front window
Reinstall screen in front window by entry, Left uninstalled at time of inspection.
Install 1 smoke detector in center bedroom
Replace batteries for 2 smoke detectors throughout unit.
Install 8 door stoppers and 3 hinge stoppers as needed throughout unit.
Deep clean and paint HVAC vents throughout unit white
Notes
Contact landscapers to provide regular landscaping.
Property
222 Meador Lane UNIT 1
Burleson, TX 76028
UNIT 1
Assignment
Eduardo Palma
Scheduled: 01/19/2026
Estimator
Run AI EstimateNo estimates saved for this meld yet.
Message history
Showing 0
No messages found for this meld yet (or sync hasn’t pulled them in).
Timeline
Created
14-Jan, 5:54 pm
Updated
18-Jan, 11:03 pm
Assigned
18-Jan, 11:03 pm
Due date
-