2200 Seville Court UNIT 1
The grout from the tiles that were repaired on the 30th of October has been falling and coming off a
Photos
Completed
Days open: 69
Warranty / owner-preferred contractor
Additional details
Resident said: The grout from the tiles that were repaired on the 30th of October has been falling and coming off as we’ve been cleaning and using shower. There are some tiles that have little to no grout left and is causing some of the tiles to be loose and water to leak back into the utility room light.
Additional Details: Loose tiles are allowing water to leak into the light in the utility room
Permission to Enter: No
Entry Notes: Dog (in cage)
Assignment
Jorge ortiz
Scheduled: -
Unit Maintenance Profile
View full unit profile
BA unit id: 189
•
PM unit id: 890198
Unit maintenance sections are not available.
Completion
Completion date
05-Feb, 9:24 am
Completion notes
When we arrived we could see that there was several tiles coming off the wall and the sheetrock behind was crumbling from being wet. This is the only bathroom with shower. There is a few tiles on the wall with the shower faucet as well that has tiles buckling. Covered with plastic the area that was heavily damaged so that when tenant take a shower it doesn't continue to leak downstairs to laundry room. Sending estimate to maintenance coordinator.
Messages
Visible to managers, vendors, residents, and owners
Send a message
Choose recipients, then send.
Recipients
Contacts
Assignment
Jorge ortiz
This updates our dispatch assignment (and can differ from Property Meld until scheduled).
Technician / Vendor Assigned
Jorge ortiz
Scheduled: -
AI Coordinator Assistant Click to expand
Suggestion
—